PowerHouse Reno Campus

reported under construction

PowerHouse Data Centers

600 Britain Drive · McCarran · Storey County · Nevada

Planned 65 MWSource updated 29 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
PowerHouse Data Centers
Address and locality
600 Britain Drive · McCarran · Storey County · Nevada
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 65 MW (source-reported; boundary not independently verified)
Source freshness
29 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001141

What the source record says

Three two-story powered-shell buildings totalling 900,000 sq ft on 49 acres, developed with parent American Real Estate Partners (AREP). The 65 MW figure is the campus figure in PowerHouse's own groundbreaking release; a facility directory separately lists a 200 MW figure for the site, which is not recorded here because it was not read on a primary page this session.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-10 · reported under construction

    PowerHouse broke ground on the 49-acre, three-building, 900,000 sq ft campus at the Tahoe Reno Industrial Center; first building targeted for Q3 2025 and full campus completion in 2028.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID powerhouse-reno-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →