Facility snapshot
- Operator as published
- Novva Data Centers
- Address and locality
- McCarran · Storey County · Nevada
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Planned: 60 MW (source-reported; boundary not independently verified)
- Source freshness
- 14 August 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001062
What the source record says
300,000 sq ft, 60 MW data center on a 20-acre campus at 1 Astro Way in the Tahoe-Reno Industrial Center (McCarran / Storey County). Six 10 MW data halls served by an on-campus 100 MW NV Energy substation; water-free direct-to-chip cooling. Coordinates are an approximate TRIC-area geocode (exact parcel point not published).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-07-08 · reported operational
Novva announced Tahoe Reno officially open for business — its fourth completed data center; additional capacity phasing into 2026.
Sources and attribution
- Novva Data Centers Announces the Launch of Tahoe Reno Data Center (PR Newswire) · Novva Data Centers / PR Newswire
- American data center operator Novva launches facility in Nevada (DCD) · Data Center Dynamics
- Novva Tahoe Reno Data Center — 1 Astro Way (60 MW), Storey County · Data Center Map
- Novva Data Centers Tahoe Reno — launch of Tahoe Reno data center · Novva Data Centers
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID novva-tahoe-reno-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.