Facility snapshot
- Operator as published
- PowerHouse Data Centers
- Address and locality
- Chester · Chesterfield County · Virginia
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 120 MW (source-reported; boundary not independently verified)
- Source freshness
- 8 July 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001133
What the source record says
Chester, Chesterfield County — first phase of a Blue Owl / Chirisa / PowerHouse JV: initial 50 MW (2025) → 120 MW facility, with a ~1 GW eventual plan (in notes). $600M construction loan closed. Distinct parcel from Google's Midlothian (Chesterfield) campus. Coordinates are the Chester area centroid. The $600M is a construction loan (financing) and the $5B is the multi-site JV total - neither is this campus's capex -> investmentUsd omitted. 800-1,200 jobs projected over 5-7 years spanning construction and operations -> jobs honest-zero. Virginia law bars per-company data-center subsidy disclosure -> subsidy honest-zero. Joint venture with Chirisa Technology Parks and Blue Owl Real Estate.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2024 · reported under construction
Blue Owl / Chirisa / PowerHouse JV first phase: initial 50 MW by 2025 expanding to a 120 MW facility (1 GW eventual plan); $600M construction loan closed
Sources and attribution
- Blue Owl, Chirisa Technology Parks and PowerHouse Data Centers announce first phase of $5 billion JV development partnership · PowerHouse Data Centers
- Chirisa Technology Parks and PowerHouse launch hyperscale campus in Chesterfield County · PR Newswire
- Richmond, Va.-area counties split on data centers · Government Technology
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID powerhouse-chirisa-chester-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.