Planned 800 MWSource updated 26 August 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
PowerHouse Data Centers
Address and locality
Spotsylvania · Spotsylvania County · Virginia
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 800 MW (source-reported; boundary not independently verified)
Source freshness
26 August 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001130

What the source record says

Campus located at approximately 4189 Turner Ct, Spotsylvania County, VA along the I-95/Hwy 17 corridor; coordinates are approximate. Three 300 MW substations planned (800 MW total); first substation delivering 150 MW targeted for Q4 2025. Up to 8 buildings, 3.5 million sq ft. Phased delivery Q3 2025–Q4 2027. Joint venture between PowerHouse/AREP and Harrison Street. Harrison Street managing director explicitly cited 'high-powered computing, AI, and other advancements' as the demand driver for this campus class, supporting likely AI classification. Named tenant not disclosed. Dominion Energy utility attribution is inferred from service territory: Dominion's Tributary 230 kV project was approved by Virginia SCC (June 30, 2024) specifically to serve growing Spotsylvania data center demand; PH95 press materials do not name the utility directly. Investment amount, job figures, and water draw not disclosed in any sourced press materials. Joint venture: American Real Estate Partners (AREP) and Harrison Street.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-01 · reported proposed

    PowerHouse announced completed purchase of 145 acres in Spotsylvania County along I-95/Hwy 17 corridor for PowerHouse 95 campus; three 300 MW substations planned.

    Open cited source →

  2. 2024-07 · reported under construction

    Groundbreaking announced; company posted on LinkedIn 'Construction on PH 95 North is underway!' DCD coverage July 19, 2024.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID powerhouse-95-spotsylvania-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →