This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Switch
- Address and locality
- 1 Superloop Circle · McCarran · Storey County · Nevada · 89434
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Operational: 250 MW; Planned: 650 MW (source-reported; boundary not independently verified)
- Source freshness
- 11 September 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001394
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2017 · reported under construction
- 2019 · reported operational
Located in Tahoe Reno Industrial Center (TRIC); expanding toward 650 MW campus
Sources and attribution
- Switch CITADEL Campus — Switch.com · Switch
- Switch unveils 650 MW campus in Reno, Nevada — Data Center Knowledge · Data Center Knowledge
- Switch TAHOE RENO Now Open — largest, most advanced data-center campus in the world · Switch
- Have data center tax breaks helped Nevada's economy? — The Nevada Independent · The Nevada Independent
- Switch Will Support Reno Data Center Campus with Reclaimed Water — Data Center Frontier · Data Center Frontier
- Switch TAHOE RENO Now Open: Largest, Most Advanced Data Center Campus in the World · PR Newswire (Switch)
- NDEP Class I Air Quality Operating Permit to Construct AP7375-3672 issued to Switch, Ltd. - physical address 1 Superloop Circle, McCarran NV 89434, HA 83 Tracy Segment / Storey County · Nevada Division of Environmental Protection
- PeeringDB facility registry (Nevada) - Switch Tahoe Reno, org Switch, Ltd., 1 Superloop Circle, McCarran 89434 · PeeringDB
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID switch-citadel-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.