Licensed lead · not independently verified · dcd-dir-001394

Switch CITADEL Campus

reported operational

Switch

1 Superloop Circle · McCarran · Storey County · Nevada · 89434

Planned 650 MWOperational 250 MWSource updated 11 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Switch
Address and locality
1 Superloop Circle · McCarran · Storey County · Nevada · 89434
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 250 MW; Planned: 650 MW (source-reported; boundary not independently verified)
Source freshness
11 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001394
Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2017 · reported under construction

    Open cited source →

  2. 2019 · reported operational

    Located in Tahoe Reno Industrial Center (TRIC); expanding toward 650 MW campus

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID switch-citadel-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →