This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- PowerHouse Data Centers
- Address and locality
- Uhland · Caldwell County · Texas
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 4,000 MW (source-reported; boundary not independently verified)
- Source freshness
- 16 August 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001142
What the source record says
Within the larger Caldwell Valley Technology Park megasite near Austin/San Antonio - a distinct operator/parcel from Tract's own 1,515-acre/2,000MW land holding in the same park (existing tracked entry tract-caldwell-valley-uhland-tx); do not conflate the two. ~700MW figure from a single-source tracker, not independently verified, so omitted from capacityMw. PowerHouse has filed a petition to move the site from Town of Uhland jurisdiction to Caldwell County jurisdiction (lighter TX zoning authority at the county level). Coordinates are approximate.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- PowerHouse looking to build 500-acre data center near Austin, Texas · Data Center Dynamics
- PowerHouse plans Austin suburb data center, moves to skirt city control · Bisnow
- 500-Acre Texas Data Center Project Eyed by PowerHouse (Baxtel) · Baxtel
- Tract Data Center Technology Park — Central Texas Data Center Tracker (Bluebonnet/LCRA/gas pipeline detail)
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID powerhouse-uhland-caldwell-county-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.