Licensed lead · not independently verified · dcd-dir-000630

Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)

reported under construction

Fleet Data Centers

McCarran · Storey County · Nevada

Planned 400 MWSource updated 14 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Fleet Data Centers
Address and locality
McCarran · Storey County · Nevada
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 400 MW (source-reported; boundary not independently verified)
Source freshness
14 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000630

What the source record says

Two adjacent TRIC campuses (South Valley and Peru Ridge) along USA Parkway in Storey County, dual two-story buildings each, ~769-acre combined footprint and a reported combined ~400MW of critical compute plus ~30MW/campus utility power. Fully leased to an unnamed AA-rated, investment-grade tenant (market cap >$3T) under a ~16.4-year triple-net lease; Fleet closed $4.6B in senior secured notes for a 230MW Storey County campus. Groundbreaking May 2026. Coordinates approximate to the TRIC/USA Parkway area.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-05-20 · reported under construction

    Groundbreaking attended by Gov. Joe Lombardo at TRIC along USA Parkway.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID fleet-data-centers-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →