Licensed lead · not independently verified · dcd-dir-000546

EdgeCore Reno Data Center Campus

reported under construction

EdgeCore Digital Infrastructure

3000 NV-439 · McCarran · Storey County · Nevada · 89434

Planned 216 MWSource updated 11 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
EdgeCore Digital Infrastructure
Address and locality
3000 NV-439 · McCarran · Storey County · Nevada · 89434
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 216 MW (source-reported; boundary not independently verified)
Source freshness
11 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000546

What the source record says

Three hyperscale buildings totalling nearly 1 million sq ft at roughly 72 MW each. Sources diverge on framing: the 2023 announcement describes 136 acres in 'north Reno' supporting 400+ MW, while EdgeCore's current location page describes a 56-acre, 216 MW developed phase in the Tahoe-Reno Industrial Center (Storey County). The current page is treated as authoritative for the developed campus; the larger land position is recorded here rather than as capacity.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023-08-10 · reported proposed

    EdgeCore announced the purchase of 136 acres in the greater Reno market for a campus capable of supporting over 400 MW of critical load.

    Open cited source →

  2. 2026-01 · reported under construction

    EdgeCore reported active construction under way on the first of three data centers at the Greater Reno campus.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID edgecore-reno-campus-storey-county-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →