This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Switch
- Address and locality
- 1 Superloop Circle · McCarran · Storey County · Nevada · 89434
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 24 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001407
What the source record says
Named explicitly in Switch's groundbreaking press release for 2nd/3rd Tahoe Reno buildings.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Switch facility directory · Switch
- OpenStreetMap way/1320683840 · OpenStreetMap
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- Switch/Capital Dynamics groundbreaking release (127MW behind-the-meter + 240MWh storage, Storey County)
- Switch sustainable data center design page (Nevada-specific 179MW claim, 100% renewable since 2016)
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID switch-tahoe-reno-3-the-citadel-campus-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.