This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Switch
- Address and locality
- Lithia Springs · Douglas County · Georgia
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 24 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001392
What the source record says
Confirmed at 1 Switch Way, Lithia Springs GA (Douglas County) via datacentermap, datacenters.com, baxtel. AI/HPC (likely): The Keep: Tier 5 Platinum exascale campus, high-density AI/HPC-capable.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Switch facility directory · Switch
- OpenStreetMap way/975064004 · OpenStreetMap
- Switch sustainable data center design page (Nevada-specific renewable claim, no GA project named)
- Canary Media: Georgia Power will now let data centers bring their own clean energy (general utility program context, not Switch-specific)
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID switch-atlanta-the-keep-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.