This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- QTS Data Centers
- Address and locality
- Eagle Mountain · Utah County · Utah
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 200 MW (source-reported; boundary not independently verified)
- Source freshness
- 16 August 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001203
What the source record says
Groundbreaking was October 2025; the third of three initial buildings topped out (structural completion) on 2026-04-20. Not yet operational; no delivery date confirmed.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2023 · reported permitted
City of Eagle Mountain approved construction; 193-acre campus adjacent to Meta campus
- 2024 · reported under construction
Construction initially paused, then restarted; 3 buildings ranging 579,000–592,000 sq ft; water-free cooling system
Sources and attribution
- QTS begins construction on new datacenter campus in Eagle Mountain — Eagle Mountain City · Eagle Mountain City
- Eagle Mountain 193-acre data center campus set to be done this year — Utah News Dispatch · Utah News Dispatch
- QTS Eagle Mountain — official data center page · QTS Data Centers
- Eagle Mountain RDA — Sweetwater #3 CRA / QTS participation agreement (Aug 2024 packet) · Eagle Mountain City / Utah Public Notice
- Questions grow over water use at massive QTS Data Center in Eagle Mountain — KUTV · KUTV (CBS Utah)
- To power Utah's data center boom, companies are turning to fossil fuels — Grist · Grist
- Layton Construction, QTS Data Centers Break Ground on Eagle Mountain Campus · Utah Business
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID qts-eagle-mountain-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.