QTS Aurora-Denver Data Center Campus (DEN1)

reported under construction

QTS Data Centers

Aurora · Arapahoe County · Colorado

Planned 177 MWSource updated 8 August 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
QTS Data Centers
Address and locality
Aurora · Arapahoe County · Colorado
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 177 MW (source-reported; boundary not independently verified)
Source freshness
8 August 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001195

What the source record says

1160 N. Gun Club Rd, Aurora, CO 80018; eastern Aurora near E-470. Former JPMorgan data center site. Four-building campus on 67 acres. Colorado's first hyperscale facility at this scale. Coordinates based on Gun Club Rd address. Investment amount and specific job counts (previously $1B, 500 construction, 77 permanent) removed — not confirmed by cited sources. QTS Data Centers is owned by Blackstone (2021 take-private). As of 2026-07-08, one of the campus's three buildings is complete, a second is nearly finished, and site work has begun on the third. A July 2025 permit application seeks 98 additional diesel backup generators on top of the existing 40.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2022-05 · reported proposed

    QTS added Denver Campus to its website; site at 1160 N. Gun Club Rd, Aurora (former JPMorgan data center site)

    Open cited source →

  2. 2024-01 · reported under construction

    Construction underway; Holder Construction as general contractor; 2,713 tons of steel and 347,000 sq ft of decking reported

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID qts-aurora-co. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →