QTS Bessemer (Project Marvel)

reported proposed

QTS Data Centers

Bessemer · Jefferson County · Alabama

Planned 1,200 MWSource updated 9 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
QTS Data Centers
Address and locality
Bessemer · Jefferson County · Alabama
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 1,200 MW (source-reported; boundary not independently verified)
Source freshness
9 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001212

What the source record says

Codename: Project Marvel. 18-building hyperscale campus on Red Ridge near I-459 and I-20/59 interchange in Bessemer (Jefferson County). Announced capacity: up to 1,200 MW at full build-out — reported as a planned ceiling, roughly 9% of Alabama Power's current generating capacity; recorded as capacityMw.planned = 1200 (an announced 'up to' full-build-out ceiling, consistent with how the dataset records other announced full-build-out figures). Investment: reported at $14–14.5B across sources (Logistics Land Investment anticipated 'close to $14.4B'; WBRC reported $14.5B at November 2025 rezoning; DCD reported ~$14B); no single firm company-confirmed figure exists — treated as a projected cost range and excluded from investmentUsd. Land: ~1,607.42 acres total after two rezoning rounds (initial ~700 acres November 2025 + 914-acre expansion April 2026). QTS affiliate purchased land from TPA Group affiliate for $431.73M. Chapter 9B statutory eligibility would have provided a 30-year abatement estimated at $500M+; QTS committed not to seek local property tax incentives (per WBRC July 2026) — subsidy excluded as eligibility does not equal award and QTS renounced pursuit. Full buildout timeline: 7+ years. Birmingham Business Alliance estimated ~$4B net benefit over 30 years; Bessemer City Schools projected ~$25M/year. AI framing not officially confirmed by QTS or the city as of July 2026 — size and scale (hyperscale, cloud/AI demand framing in QTS statement) support 'likely' classification. Coordinates are approximate for the Red Ridge parcel area. Jobs: ~1,000 construction and ~330 permanent are projected figures for the proposed (not-yet-built) campus (WBRC, Nov 2025) — recorded as projections in notes, not structured jobs fields, per data-rigor policy. QTS Data Centers is owned by Blackstone (2021 take-private). STATUS JUDGEMENT SURFACED, NOT APPLIED: Bessemer approved land-use rezonings for this campus in November 2025 and again (914 acres) in April 2026, which under the wave's rule that a rezoning approval means permitted could argue for permitted rather than proposed. I did not change it, because the record's own cited source dated 2026-07-02 postdates both rezonings and still describes the campus as proposed, and no building permit or site-preparation start was found in any source fetched this run. A maintainer should decide whether a rezoning alone promotes this record.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · reported proposed

    Project Marvel first surfaced March 2025; unnamed developer (via Logistics Land Investment LLC, an affiliate of Atlanta-based TPA Group) sought rezoning of ~700 acres in Bessemer for hyperscale data center

    Open cited source →

  2. 2025 · reported proposed

    Bessemer City Council voted 5-2 to approve rezoning ~700 acres from agricultural (A-1) to light industrial (I-1) on November 18, 2025; developer identity still not publicly disclosed

    Open cited source →

  3. 2026 · reported proposed

    Bessemer City Council approved rezoning of 914 additional acres in April 2026, expanding total site to ~1,607 acres; 18-building count unchanged, additional land used for wider buffers and layout flexibility

    Open cited source →

  4. 2026 · reported proposed

    QTS Data Centers (Blackstone) publicly confirmed as operator behind Project Marvel, July 1-2, 2026; project described as in active planning stage

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID qts-marvel-bessemer-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →