Colossus

reported operational

xAI

Memphis · Shelby County · Tennessee

Planned 1,200 MWOperational 150 MWSource updated 10 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
xAI
Address and locality
Memphis · Shelby County · Tennessee
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 150 MW; Planned: 1,200 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001585

What the source record says

Subsidies checked 2026-09-09: confirmed absence. Unlike the usual Memphis path, xAI did not obtain a PILOT or any formally granted incentive for the Memphis site, so the subsidies field is deliberately left empty rather than unknown. The site is instead expected to pay more than $30 million in combined Memphis and Shelby County property taxes. CORRECTION: energy.notes currently states 'an SELC/NAACP appeal stays that permit' -- this is stale. The Memphis and Shelby County Air Pollution Control Board voted 6-1 on 2025-12-15 to dismiss the NAACP/Young, Gifted & Green appeal of Air Permit No. 01156-01PC as moot, ending the appeal-triggered stay. Recommend energy.notes be updated to reflect that the appeal was dismissed (not that it currently stays anything), and that community.notes (currently 'an SELC/NAACP appeal to the Shelby County Air Pollution Control Board stays it') be updated the same way. Separately, a 2026-04-14 federal Clean Air Act suit (NAACP v. X.AI Corp. and MZX Tech LLC, No. 3:26-cv-00074, N.D. Miss.) is ongoing, but its claims target xAI's Southaven, MS 'Colossus Gas Plant' (MZX Tech LLC, 2875 Stanton Road South) -- a different facility -- not this Memphis site or CTC Property LLC, which is not a named defendant; it cites this site's turbine history only as background evidence of a pattern. Full primary-source detail (including that the permit covers 15 turbines permanently, not 35) is now captured in the companion new-facility record xai-colossus-1-turbines-memphis-tn. CORRECTION (sourcing quality, not fact): sources[0] and sources[5] both cite en.wikipedia.org/wiki/Colossus_(supercomputer), an aggregator-tier source, for this site of all sites. sources[0] is the sourceIndex behind statusHistory[0] ('Construction began; completed in approximately 122 days', dated 2024-06). Primary/official and named-quote replacements found and fetched this run: (1) NVIDIA's own newsroom press release (2024-10-28, official/primary) states Colossus was 'built by xAI and NVIDIA in just 122 days, instead of the typical timeframe' and comprises '100,000 NVIDIA Hopper GPUs in Memphis, Tennessee'; (2) Fortune (2025-03-14) quotes Super Micro CEO Charles Liang on the record: 'It took Elon and Super Micro only 122 days to finish,' adding it would usually take a year or longer. Per instructions, I have NOT attempted to delete or reorder the existing Wikipedia citations myself -- these two sources are offered as additions for the maintainer to use when manually reordering/replacing sources[0] and sources[5].

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-06 · reported under construction

    Construction began; completed in approximately 122 days

    Open cited source →

  2. 2024-09 · reported operational

    Phase 1 online with ~100,000 NVIDIA H100 GPUs; later expanded with H200s

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID xai-colossus-memphis-tn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.