5C MEM01 Memphis (former Fred's headquarters)

reported under construction

5C Data Centers

4300 Getwell Road · Memphis · Shelby County · Tennessee · 38118

Planned 15 MWSource updated 14 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
5C Data Centers
Address and locality
4300 Getwell Road · Memphis · Shelby County · Tennessee · 38118
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 15 MW (source-reported; boundary not independently verified)
Source freshness
14 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000015

What the source record says

Conversion of the former Fred's discount-retail headquarters, a multi-storey warehouse and office complex bought by Olymbec in 2019. DCD (2025-05-06), citing WREG, reports plans were submitted to Shelby County in late 2024 to convert 4300 Getwell Road into a data center supporting an initial 15MW IT load in phase one; the 15 MW phase-one figure is what is recorded as planned capacity. 5C's own site separately listed a Memphis facility, MEM01, at 20MW in 2025 and 60MW from 2027 — those larger figures are second-hand in this source and are deliberately NOT recorded as capacity. The 965,000 sq ft / 59-acre complex figures are Olymbec's, for the whole property, not for the data-center footprint. Quebec firms Adag Group and Hypertec are involved; 5C was subsequently acquired by Hypertec. Status is proposed and confidence reported: no source fetched here confirms permit issuance or construction start. Separately, Memphis City Council members led by JB Smiley Jr. introduced a proposed ordinance on 2026-08-16 for a temporary moratorium on new data-center developments citywide, which is context for this site but is not stated to apply to it.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-09-14 · reported under construction

    Construction is under way rather than merely proposed: 5C MEM01 LLC closed on the former Fred's headquarters for $25 million (deed of record), and drone footage in January 2026 captured ongoing construction on the rear of the building including what appeared to be turbines.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID 5c-mem01-memphis-tn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →