Licensed lead · not independently verified · dcd-dir-001588

xAI Southaven

reported operational

xAI

Southaven · DeSoto County · Mississippi

Planned 2,000 MWSource updated 9 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
xAI
Address and locality
Southaven · DeSoto County · Mississippi
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Planned: 2,000 MW (source-reported; boundary not independently verified)
Source freshness
9 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001588

What the source record says

Address: 2400 Stateline Road, Southaven, MS 38671 (near Tennessee border); coordinates are approximate for that address. The $20B investment figure covers total xAI Mississippi commitments including adjacent power plant site, not only this building. Facility is distinct from the already-tracked Colossus supercomputer clusters in Memphis, TN. Combined with Memphis facilities, xAI aims for nearly 2 GW total compute capacity. Fix: jobs.sourceIndex corrected from 0 to 1; the specific 145-person figure is reported by Mississippi Free Press (source 1), not the governor's press release (source 0) which states only 'hundreds of permanent jobs.'

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-01 · reported proposed

    Governor Reeves and xAI announce $20B+ Southaven data center investment; described as largest private-sector investment in Mississippi history

    Open cited source →

  2. 2026-01 · reported under construction

    Retrofit of former GXO Logistics warehouse (810,000 sq ft) at 2400 Stateline Road

  3. 2026-02 · reported operational

    Expected fully operational February 2026; xAI's third Mid-South facility alongside Colossus One and Two in Memphis

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID xai-southaven-ms. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →