This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Expedient
- Address and locality
- 3180 Players Lane · Memphis · Shelby County · Tennessee · 38125
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Operational: 1.5 MW (source-reported; boundary not independently verified)
- Source freshness
- 14 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000613
What the source record says
The 1.5 MW value is the operator's stated critical IT load; aggregator listings circulating an 8 MW figure were not used.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-09-14 · reported operational
35,000 sq ft facility with 7,500 sq ft of raised floor, 1.5 MW of critical IT load, 2.0 MW total generator capacity and a 2N UPS configuration.
Sources and attribution
- PeeringDB facility 8473 — Expedient Memphis, 3180 Players Lane, Memphis · PeeringDB
- Expedient Memphis data center (MEM1) specifications — 1.5 MW critical load, 35,000 sq ft · Expedient
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID expedient-memphis-tn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.