Facility snapshot
- Operator as published
- Tract
- Address and locality
- Silver Springs · Lyon County · Nevada
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 1,600 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001496
What the source record says
Master-planned data center park near Silver Springs, Lyon County (near the US-50/USA Parkway corridor east of Reno). ~1,060 acres acquired with approved rezoning and a Lyon County development agreement; buildout capacity up to 1.6GW with an initial 700MW under utility study, planned dry/air-cooled to minimize water use. Land/entitlement stage — proposed, not yet under construction. Coordinates approximate to Silver Springs.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-09 · reported proposed
Tract closed on ~1,060 acres near Silver Springs following rezoning and a development agreement approved by Lyon County; site master-planned for up to 1.6GW with an initial 700MW under utility study.
Sources and attribution
- Tract Expands Its Greater Reno Portfolio, Closing on 1,060 Acres in Silver Springs, Nevada · Tract
- Tract acquires 1,000 acres in Nevada for 1.6GW data center park · Data Center Dynamics
- Lyon County approves Tract Capital's data center project plan in Silver Springs · CitizenPortal.ai
- Tract Silver Springs Data Center · Data Center Map
- Tract Acquires 1,000 Acres in Nevada for 1.6GW Data Center Park · Baxtel
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID tract-silver-springs-nv. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.