QTS Cedar Rapids Data Center Campus

reported under construction

QTS Data Centers

Cedar Rapids · Linn County · Iowa

Planned 1,050 MWSource updated 16 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
QTS Data Centers
Address and locality
Cedar Rapids · Linn County · Iowa
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 1,050 MW (source-reported; boundary not independently verified)
Source freshness
16 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001197

What the source record says

Coordinates approximate for Big Cedar Industrial Center; parcel is adjacent to Google's campus in the same 1,391-acre industrial park. $10B investment is total planned across 7 phases over up to 25 years; minimum $250M per phase, each requiring a 300,000 sq ft building. 7 buildings planned at full build-out. Permanent jobs figure is minimum per phase. QTS Co-CEO Tag Greason stated the completed seven-building campus will ultimately draw about 1,050 MW of power from Alliant Energy (planned, full build-out). QTS Data Centers is owned by Blackstone (2021 take-private).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-01 · reported permitted

    Cedar Rapids City Council approved development agreement with QTS Cedar Rapids LLC on January 28, 2025

    Open cited source →

  2. 2025 · reported under construction

    Ground broken on first building; April 2026 site tour attended by U.S. Energy Secretary Chris Wright confirmed active construction

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID qts-cedar-rapids-ia. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.