Licensed lead · not independently verified · dcd-dir-001486

Tract Caldwell Valley Technology Park

reported proposed

Tract

Uhland · Caldwell County · Texas

Planned 2,000 MWSource updated 25 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Tract
Address and locality
Uhland · Caldwell County · Texas
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 2,000 MW (source-reported; boundary not independently verified)
Source freshness
25 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001486

What the source record says

1,515-acre megasite in Caldwell County (Uhland area, between Austin and San Antonio); over 2 GW at full buildout (expansion toward ~4 GW is a ceiling — in notes), initial 360 MW utility delivery H1 2028 via Blue Bonnet Electric Cooperative. Land acquisition closed May 2025 (pre-construction). Coordinates are the Uhland area centroid.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-05 · reported proposed

    Tract closed on 1,515 acres in Caldwell County (between Austin and San Antonio) for a multi-gigawatt data-center technology park; Facility Design Agreement with Blue Bonnet Electric Coop; initial 360 MW energization H1 2028

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID tract-caldwell-valley-uhland-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →