This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- PowerHouse Data Centers
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 300 MW (source-reported; boundary not independently verified)
- Source freshness
- 8 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001134
What the source record says
Four-building campus (300,000 sq ft each) at the NE corner of US-377 and Westport Parkway; owner of record Circle T Owner LP. Local Westlake planning-and-zoning approval obtained as of August 2026.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-08-07 · reported proposed
Filed with and approved by Westlake planning and zoning commission.
Sources and attribution
- Westlake Planning & Zoning Commission agenda — Circle T Data Center · Town of Westlake, TX
- PowerHouse files plans for 300 MW Circle T Data Center Campus in Westlake, Texas · US Data Center Projects
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID powerhouse-circle-t-westlake-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.