Facility snapshot
- Operator as published
- PowerHouse Data Centers
- Address and locality
- Chester · Chesterfield County · Virginia
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 50 MW (source-reported; boundary not independently verified)
- Source freshness
- 23 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001135
What the source record says
50MW build-to-suit at Chirisa Technology Parks' Meadowville Technology Parkway campus (Chesterfield County), JV of PowerHouse, Chirisa, and Blue Owl Real Estate; broke ground 2024/2025, CoreWeave is the confirmed GPU/AI-cloud tenant (28MW deal Sept 2023 plus this expansion). PowerHouse's own portfolio page lists 'CTP-02 and CTP-03' as a platform entry; baxtel independently corroborates PowerHouse CTP-02 as a named facility at this campus. Joint venture with Chirisa Technology Parks and Blue Owl Real Estate.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Bisnow: CoreWeave data center at CTP's Richmond-area (Meadowville) campus lands $600M loan · PowerHouse Data Centers (JV with Chirisa Technology Parks and Blue Owl Real Estate)
- OpenStreetMap way/1449347339 · OpenStreetMap
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID powerhouse-ctp-02-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.