Facility snapshot
- Operator as published
- EdgeConneX
- Address and locality
- New Albany · Licking County · Ohio
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 224 MW (source-reported; boundary not independently verified)
- Source freshness
- 10 September 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000534
What the source record says
EdgeConneX's ~$1B multi-phase "MCN New Albany" South campus. Per the Ohio Tax Credit Authority scope-of-work filing: Phase I converts a ~525,000 sq ft existing warehouse (9850 Innovation Campus Way) into an 80 MW data center; Phase II proposes two new 72 MW facilities (144 MW) — capacityMw.planned = 224 (80 + 144, IT load). A co-located PowerConneX natural-gas energy center (reported 140–216 MW of generation across sources) is EXCLUDED from capacityMw as on-site generation, not IT load. Footprint spans the South PropCo 2 parcels (~97 ac incl. the built anchor) plus the adjacent North PropCo 1 parcel (3356 Clover Valley Rd NW, 170 ac); ~267 ac combined. "MCN" is EdgeConneX's internal project prefix (not publicly decoded). Distinct from EdgeConneX's separate Piper Farms parcel (~5 mi away) and from edgeconnex-ashville-oh (Pickaway County). Public-reception check (2026-09-10): IMPORTANT DISAMBIGUATION: this is EdgeConneX's New Albany/Licking County campus (Innovation Campus Way; Phase 1 120MW, Phase 2 216MW, Phase 3 430MW). It is a SEPARATE EdgeConneX project from the heavily-opposed EdgeConneX proposal in Ashville, Pickaway County, OH (denied annexation 2026-02-02 after packed council meetings and a Change.org petition) -- do not merge that record's contention into this one. For New Albany/Licking County specifically, a land-purchase article (2025, checked 2026-09-10) mentions only general Central Ohio-wide concern that data centers could raise electricity costs, immediately caveated because this project's power comes from dedicated on-site generation (PowerConneX), not the residential grid. No hearing, resident testimony, or official statement specific to this Licking County site was found.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025 · reported under construction
Phase I warehouse conversion (80 MW) underway; Phase II (two new 72 MW buildings) proposed. Ohio TCA sales-tax exemption approved Oct 2025.
Sources and attribution
- Licking County parcel/GIS record (EdgeConneX MCN New Albany South PropCo 2 + North PropCo 1 parcels; anchor 9850 Innovation Campus Way, 33.86 ac, "Industrial Warehouses") · Licking County Auditor GIS / Assessor
- Ohio Tax Credit Authority — Exhibit I Scope of Work, EdgeConneX MCN New Albany South Opco 1 LLC (Phase I 80 MW, Phase II 2×72 MW) · Ohio Tax Credit Authority / Gongwer
- EdgeConneX plans more than 1 million square feet of data centers in New Albany · NBC4 WCMH-TV
- $1 billion data center development buys 136 more acres in New Albany · 614NOW