Edged Columbus

reported operational

Edged (an Endeavour company)

New Albany · Franklin County · Ohio

Operational 24 MWSource updated 18 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Edged (an Endeavour company)
Address and locality
New Albany · Franklin County · Ohio
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 24 MW (source-reported; boundary not independently verified)
Source freshness
18 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000551

What the source record says

Operational since its September 10-11, 2025 grand opening. 206,000 sq ft, two-story, 14-acre site with 24 MW of critical (IT) capacity per Edged's own release. Purpose-built for AI training and inference; supports up to 70 kW/rack air-cooled and 200 kW/rack liquid-cooled. Uses the ThermalWorks waterless cooling system (design PUE ~1.15). Adjacent parcel 222-001945 (7270 New Albany-Condit Rd, commercial vacant land) is future expansion land, not part of this operational record.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-09 · reported operational

    Grand opening Sept 10-11, 2025

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID edged-columbus-new-albany-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →