This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Edged (an Endeavour company)
- Address and locality
- New Albany · Franklin County · Ohio
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Operational: 24 MW (source-reported; boundary not independently verified)
- Source freshness
- 18 July 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000551
What the source record says
Operational since its September 10-11, 2025 grand opening. 206,000 sq ft, two-story, 14-acre site with 24 MW of critical (IT) capacity per Edged's own release. Purpose-built for AI training and inference; supports up to 70 kW/rack air-cooled and 200 kW/rack liquid-cooled. Uses the ThermalWorks waterless cooling system (design PUE ~1.15). Adjacent parcel 222-001945 (7270 New Albany-Condit Rd, commercial vacant land) is future expansion land, not part of this operational record.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-09 · reported operational
Grand opening Sept 10-11, 2025
Sources and attribution
- Franklin County parcel/GIS record (parcel 222-002127 — EDGED COLUMBUS LLC, 7600 W Campus Blvd, use-class "data center") · Franklin County Auditor GIS / Assessor
- Edged US Opens Ultra-Efficient Data Center Built for AI Training and Inference in Ohio's Silicon Heartland · Edged US
- New Albany welcomes $246 million Edged Data Center promising water, energy efficiency · Columbus Dispatch (syndicated)
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID edged-columbus-new-albany-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.