Facility snapshot
- Operator as published
- EdgeConneX
- Address and locality
- Ashville · Pickaway County · Ohio
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 8 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000525
What the source record says
680 acres north of SR-752; 1.8GW substation plus a 200MW gas turbine energy center planned. Facing local opposition/criticism. The adjacent Ashville Energy Center (PowerConneX) OPSB filing now specifies up to 800 MW of generating capacity on ~110 acres, up from the 200 MW gas-turbine figure previously noted here — this is the power plant's nameplate generation, not a confirmed data-center IT load; at least one press aggregator miscalls this "the data center's capacity," but the primary OPSB filing does not support that reading.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported proposed
Sources and attribution
- Proposed EdgeConneX data center in Pickaway County, Ohio facing criticism · Data Center Dynamics
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- Public Info Meeting #1 — Ashville Energy Center · Ohio Power Siting Board