Licensed lead · not independently verified · dcd-dir-000528

EdgeConneX DEN01 Denver

reported operational

EdgeConneX

Englewood · Douglas County · Colorado

Operational 3 MWSource updated 26 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
EdgeConneX
Address and locality
Englewood · Douglas County · Colorado
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 3 MW (source-reported; boundary not independently verified)
Source freshness
26 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000528

What the source record says

29,800 sq ft facility with 9,300 sq ft of raised floor across two data halls and 3 MW N+1, with an additional 1.5 MW build in progress. EPA ENERGY STAR certified per the operator. On Highfield Parkway in the Meridian/Englewood submarket; coordinates are an approximate street-level point.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-08-26 · reported operational

    Operator lists two live data halls and an additional build in progress.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID edgeconnex-den01-denver-co. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →