Licensed lead · not independently verified · dcd-dir-000042

Aligned ORD-01

reported operational

Aligned Data Centers

505 Northwest Ave · Northlake · Cook County · Illinois · 60164

Operational 48 MWSource updated 12 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Aligned Data Centers
Address and locality
505 Northwest Ave · Northlake · Cook County · Illinois · 60164
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 48 MW (source-reported; boundary not independently verified)
Source freshness
12 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000042

What the source record says

Confirmed via Aligned Chicago page and DatacenterDynamics ('Aligned completes first Chicago data center'); 505 Northwest Ave, Northlake, IL; 48MW, operational. AI/HPC (likely): Northlake ORD-01 hyperscale, adaptive AI/HPC cooling platform.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aligned-ord-01-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →