Aligned Data Centers – Conesville Industrial Park

reported under construction

Aligned Data Centers

Conesville · Coshocton County · Ohio

Planned 340 MWSource updated 9 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Aligned Data Centers
Address and locality
Conesville · Coshocton County · Ohio
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 340 MW (source-reported; boundary not independently verified)
Source freshness
9 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000034

What the source record says

Brownfield redevelopment of former AEP Conesville coal plant (2 GW, operational 62 years, closed May 2020). Frontier Group of Companies acquired the plant in 2020 and built the Conesville Industrial Park across ~2,500 acres; Aligned purchased a 197-acre parcel. Aligned describes the project as 'AI/HPC' and 'Gigascale' in its press materials, and this is its third Ohio campus (others: Perkins Township/Sandusky, 96 MW total; Pataskala). Multi-building campus — renderings show up to four buildings; second, third, and fourth buildings referenced at groundbreaking. Capacity MW not publicly disclosed. Investment described as 'multi-billion dollar' — no firm figure confirmed; field omitted per policy. Construction jobs described as 'thousands'; permanent roles as 'hundreds of high-quality long-term positions' — projections only, numeric fields omitted. Aligned is exploring on-site nuclear power (SMRs) for this campus and nearby Zanesville/Cambridge sites; no agreement confirmed. Coordinates approximate (village-level). Site infrastructure funding note: the Coshocton Port Authority received a $58.7M grant (Ohio Dept of Development All Ohio Future Fund, announced July 21, 2025) for utility upgrades, water/wastewater extensions, and roadway improvements across the broader industrial park — this benefits Aligned indirectly but is not a direct subsidy to Aligned and is therefore not listed under subsidies.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-07-24 · reported proposed

    Aligned press release; 197-acre campus at Conesville Industrial Park, foundational customer secured, initial delivery mid-2026

    Open cited source →

  2. 2025-10-11 · reported under construction

    Groundbreaking ceremony held at Conesville Industrial Park

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aligned-conesville-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →