Licensed lead · not independently verified · dcd-dir-000035

Aligned Data Centers Amber Site (Grady County)

reported proposed

Aligned Data Centers

Amber · Grady County · Oklahoma

Capacity not statedSource updated 14 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Aligned Data Centers
Address and locality
Amber · Grady County · Oklahoma
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Not stated
Source freshness
14 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000035

What the source record says

An affiliate of Aligned Data Centers bought roughly 800 acres of rural land near Amber, northwest of Chickasha in Grady County, for more than $17 million. That $17M is the LAND purchase price only — it is not a project investment figure and is deliberately not recorded as investmentUsd. No capacity, building count or timeline has been made public. Coordinates are the town of Amber, not a parcel. This is a separate Grady County site from the tracked Chickasha Airport Industrial Park project.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-09-02 · reported proposed

    Land purchase near Amber surfaced publicly; Aligned says the project remains in early stages with many details unfinalized.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aligned-data-centers-amber-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →