Facility snapshot
- Operator as published
- Vantage Data Centers
- Address and locality
- 2101 M Street NE · Quincy · Grant County · Washington · 98848
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Operational: 64 MW (source-reported; boundary not independently verified)
- Source freshness
- 5 September 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001543
What the source record says
530,000 sq ft building adding 64 MW of IT capacity on Vantage's 68-acre Quincy (WA1) campus at 2101 M Street NE, bringing the campus to 89 MW across nearly 775,000 sq ft. Uses Tier 4 generators to reduce particulate and NOx emissions. Construction began in late 2022 and the building was delivered Oct. 18, 2023. Sibling buildings WA11 and WA12 are already tracked separately; the 89 MW and 68 acres are campus-level figures and are not attributed to this building. Coordinates are an approximate geocode of the campus address.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2023-10-18 · reported operational
Vantage announced delivery of WA13, the third and final facility on its Quincy (WA1) campus.
Sources and attribution
- Vantage Data Centers Completes Development of 89MW, $1 Billion Quincy, Washington Campus · Vantage Data Centers
- Quincy, Washington Data Center Campus · Vantage Data Centers
- Quincy, WA data center facility directory (Vantage WA11/WA12/WA13) · Baxtel
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID vantage-wa13-quincy-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.