Licensed lead · not independently verified · dcd-dir-000378

CyrusOne PNW1

reported operational

CyrusOne

1025 D Street NW · Quincy · Grant County · Washington · 98848

Operational 90 MWSource updated 22 August 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
CyrusOne
Address and locality
1025 D Street NW · Quincy · Grant County · Washington · 98848
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 90 MW (source-reported; boundary not independently verified)
Source freshness
22 August 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000378

What the source record says

Operator describes PNW1 as Washington's largest greenfield-built data center; 720,000 sq ft technical space on a 45-acre site acquired 2016; construction began 2023.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cyrusone-pnw1-quincy-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →