This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- CyrusOne
- Address and locality
- 1025 D Street NW · Quincy · Grant County · Washington · 98848
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Operational: 90 MW (source-reported; boundary not independently verified)
- Source freshness
- 22 August 2026
- Location precision
- approximate
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000378
What the source record says
Operator describes PNW1 as Washington's largest greenfield-built data center; 720,000 sq ft technical space on a 45-acre site acquired 2016; construction began 2023.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Quincy, WA: PNW1 · CyrusOne
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID cyrusone-pnw1-quincy-wa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.