Licensed lead · not independently verified · dcd-dir-001137

PowerHouse Data Centers – Louisville (Camp Ground Road)

reported under construction

PowerHouse Data Centers

Louisville · Jefferson County · Kentucky

Planned 402 MWSource updated 15 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
PowerHouse Data Centers
Address and locality
Louisville · Jefferson County · Kentucky
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 402 MW (source-reported; boundary not independently verified)
Source freshness
15 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-001137

What the source record says

Address: 6001 Camp Ground Road, Louisville, KY; near Shively and the Rubbertown industrial district, less than 1 mile from the Ohio River. 153 acres confirmed by DCD. 1.6M sq ft total campus across seven buildings. Operator discussing tenants including major hyperscalers (Google, Amazon, Microsoft named in reports). End tenant not publicly disclosed at time of research. Fix: removed unconfirmed '50-year' duration from tax exemption description — program exists per Kentucky 2024 legislation but specific term length was not confirmed by any fetched source.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-01 · reported proposed

    PowerHouse Data Centers and Poe Companies announce Louisville campus at 6001 Camp Ground Road; Kentucky's first hyperscale data center

    Open cited source →

  2. 2025-06 · reported permitted

    Development Review Committee approves 4-0; property already zoned industrial, no Metro Council vote required

    Open cited source →

  3. 2025 · reported under construction

    Construction expected to begin 2025; Planning Commission approves revised site plans 6-1 over community objection in March 2026

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID powerhouse-louisville-ky. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →