Licensed lead · not independently verified · dcd-dir-001063

Novva West Jordan Campus

reported operational

Novva Data Centers

West Jordan · Salt Lake County · Utah

Planned 175 MWOperational 200 MWSource updated 4 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Novva Data Centers
Address and locality
West Jordan · Salt Lake County · Utah
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 200 MW; Planned: 175 MW (source-reported; boundary not independently verified)
Source freshness
4 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-001063

What the source record says

Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy, for a structural reason rather than a search miss. West Jordan's Redevelopment Agency lists six active project areas, all bounded well east of this campus; under Title 17C an agency may only act within a designated project area, so no participation agreement is available at this location under the current project-area map. The city's own 2025 post on the expansion discusses tax value in generic terms and names no incentive or agreement.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID novva-west-jordan-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →