This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Novva Data Centers
- Address and locality
- West Jordan · Salt Lake County · Utah
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Operational: 200 MW; Planned: 175 MW (source-reported; boundary not independently verified)
- Source freshness
- 4 September 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001063
What the source record says
Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy, for a structural reason rather than a search miss. West Jordan's Redevelopment Agency lists six active project areas, all bounded well east of this campus; under Title 17C an agency may only act within a designated project area, so no participation agreement is available at this location under the current project-area map. The city's own 2025 post on the expansion discusses tax value in generic terms and names no incentive or agreement.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Novva Data Centers — Utah Data Center, 100-Acre SLC Colocation Campus · Novva Data Centers
- Novva and CIM Group land $2 billion loan to complete a 175MW AI data center in West Jordan, Utah · Utah Money Watch
- Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026) · Kem C. Gardner Policy Institute, University of Utah
- West Jordan Redevelopment Agency — active project areas and boundaries · City of West Jordan
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID novva-west-jordan-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.