This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Expedient
- Address and locality
- Garfield Heights · Cuyahoga County · Ohio
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 5 August 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-000609
What the source record says
Two-building Expedient colocation campus at 15166 and 15248 Neo Parkway in Garfield Heights (Cleveland market), operating since ~2015. No clean total critical-IT-load MW figure is published (only backup-generator sizing), so capacity is omitted. Distinct from the tracked Lumen/Ark-Involta/T5 Cuyahoga sites.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- NEO 151 facility page: 15166 Neo Parkway, 24,000+ sq ft, 900 kVA UPS, dual 2.5 MW generators, 600 tons cooling · cloudandcolocation.com
- Data Center Knowledge: Expedient completes third Cleveland-market data center · Data Center Knowledge
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID expedient-cleveland-neo-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.