This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Edged US
- Address and locality
- Mesa · Maricopa County · Arizona
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Operational: 36 MW (source-reported; boundary not independently verified)
- Source freshness
- 28 August 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-000556
What the source record says
Operator-stated densities of 400+ kW per rack with liquid cooling and 120+ kW per rack with air cooling support an AI-capable classification, though no named AI tenant is disclosed. PUE, water-savings and density figures are the operator's own claims from its launch release and are not independently verified. Street address not published.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-04-01 · reported operational
Facility opened; ribbon cutting held April 2, 2026.
Sources and attribution
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID edged-mesa-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.