EdgeCore Mesa Data Center Campus

reported operational

EdgeCore Digital Infrastructure

Mesa · Maricopa County · Arizona

Planned 450 MWOperational 206 MWSource updated 8 August 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
EdgeCore Digital Infrastructure
Address and locality
Mesa · Maricopa County · Arizona
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Operational: 206 MW; Planned: 450 MW (source-reported; boundary not independently verified)
Source freshness
8 August 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000545

What the source record says

Elliot Road Technology Corridor, Mesa. CEO stated 'Greater Phoenix is fast becoming the AI center of the West.' Expansion land purchase adds 43.87 acres to 40-acre original site. EdgeCore raised $2B equity and $2B debt in 2024. Coordinates approximate for Elliot Road corridor. Arizona's data-center sales/use-tax exemption (A.R.S. Sec. 41-1519) applies by statute, but no campus-specific certified award was publicly verifiable (eligibility != confirmed award); the $150M cited is first-building capex and the $2B equity + $2B debt EdgeCore raised in 2024 is corporate financing, not Mesa-campus capex.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023-01 · reported operational

    Initial campus operational; first $150M, 180,000 sq ft building serving hyperscale AI and cloud clients

  2. 2025-05 · reported under construction

    43.87-acre expansion adds three buildings, raising planned total to 450MW and 3.1M sq ft; PH02 topped out December 2024, expected fully operational 2026

    Open cited source →

  3. 2026 · reported operational

    Campus returned to fully-operational status after the 2025 expansion phase: EdgeCore states it has "worked quickly to construct and commission 206 MW at the site" of a campus now planned for over 450 MW. The 206 MW is cumulative commissioned capacity across phases (the first building has been operational since 2023), not a single phase; remaining expansion buildings are still under construction.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID edgecore-mesa-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →