Edged Prichard Data Center (Project Gateway)

reported proposed

Edged US

Prichard · Mobile County · Alabama

Planned 8 MWSource updated 9 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Edged US
Address and locality
Prichard · Mobile County · Alabama
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 8 MW (source-reported; boundary not independently verified)
Source freshness
9 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000555

What the source record says

Developer site states verbatim: "8MW, 57,000 SF building – roughly the size of a football field", "$93 million investment in the local community", "150–200 construction jobs supported during an approximately 18-month construction period", "20 permanent full-time positions upon completion", and "Approximately $16.7 million in projected annual economic impact, including $8.3 million supporting local schools". jobs.construction records the LOW end (150) of the stated 150-200 range rather than inventing a midpoint. FOX10 adds the ~20 jobs pay "over $70,000 annually". SUBSIDY: no incentive or abatement is mentioned on the developer's project site or in FOX10's coverage; this run did NOT check Prichard or Mobile County records, so that is an unchecked gap, not an audited negative. The $16.7M annual economic impact and $8.3M schools figure are developer projections, not incentives, and are deliberately not recorded as subsidies. STATUS: the developer's own site calls the project "proposed" and "being evaluated"; no construction start is reported. Coordinates are the Prichard municipal centroid — no street address appears in any fetched source.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID edged-gateway-prichard-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →