DC BLOX Atlanta West (ATL1)

reported under construction

DC BLOX

Lithia Springs · Douglas County · Georgia

Planned 120 MWSource updated 6 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
DC BLOX
Address and locality
Lithia Springs · Douglas County · Georgia
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 120 MW (source-reported; boundary not independently verified)
Source freshness
6 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000426

What the source record says

Initial 120 MW phase (Building A); site plan includes additional 80 MW Building B (delivery early 2028) and 80 MW Building C (early 2029) totaling 200+ MW. investmentUsd reflects green loan construction financing announced August 11, 2025. Located adjacent to Microsoft Douglasville campus, 2.5 miles from Google facility. Coordinates are Lithia Springs area centroid. Original DCD source URL returned HTTP 404 and was replaced with the DC BLOX official press release, which resolves and supports all claims. The $98M Douglasville abatement was granted for the campus in the Riverside West Business Park (New River Road); city/authority filings cite 25 permanent jobs (~$130k average) and up to 500 construction jobs over five years — projections, not confirmed headcounts.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-08-11 · reported proposed

    $1.15 billion green loan financing announced; 120 MW campus on 100 acres in Lithia Springs adjacent to Microsoft campus

    Open cited source →

  2. 2025-09 · reported under construction

    Phase 1 (120 MW Building A) construction underway; delivery targeted 2026

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID dc-blox-atlanta-west-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →