Facility snapshot
- Operator as published
- DC BLOX
- Address and locality
- Conyers · Rockdale County · Georgia
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 216 MW (source-reported; boundary not independently verified)
- Source freshness
- 7 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000436
What the source record says
Coordinates approximate; physical address is 1726 Farmer Road NW, Conyers GA 30012. Land: 72 acres acquired per press release; Georgia EPD permit SAS-2024-00075 references 52.84-acre development footprint with three 40MW buildings. Capacity: 216MW total committed by Georgia Power per utility agreement and DRI filing; DC BLOX facility page cites 154 critical/IT MW (1 × 10MW + 3 × 48MW buildings = 154MW IT load). Phase 1 targeted Q4 2025 delivery (hyperscale anchor + 160,000 sq ft available to additional tenants); non-water-quality construction began December 2025; water-quality permitted work may begin October 2026 with full build taking ~1 year. Dark fiber metro ring planned around Atlanta connecting Atlanta East and Atlanta West campuses and continuing to Myrtle Beach cable landing station. AI/ML applications explicitly cited in press materials as key driver of Atlanta hyperscale demand. DISTINCT from DC BLOX Atlanta West campus in Douglas County (Lithia Springs, ~55 acres, 180MW). Investment amount not publicly disclosed. Job counts not disclosed.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2023 · reported proposed
DC BLOX announced 72-acre land acquisition in Conyers; campus designed for 750,000 sq ft and 216MW at full build-out; hyperscale anchor client named for Phase 1
- 2024 · reported under construction
Site preparation underway as of September 2024; Georgia EPD 30-day public comment period on stormwater/wetlands permit (SAS-2024-00075) closed December 18, 2025; non-water-quality construction began December 2025
Sources and attribution
- DC BLOX announces Rockdale County hyperscale campus (Dec 12 2023) · DC BLOX
- DC BLOX Atlanta East facility page · DC BLOX
- DC Blox files for data center campus outside Atlanta, Georgia · Data Center Dynamics
- EPD launches comment period for proposed Rockdale data campus · Fox 5 Atlanta
- DC BLOX Rockdale County GA community outreach page · DC BLOX
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID dcblox-atlanta-east-conyers-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.