This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Amazon Web Services
- Address and locality
- Hilliard · Franklin County · Ohio
- Lifecycle status
- reported operational
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 24 July 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-000142
What the source record says
AWS's first US East (Ohio) region data center — a ~55-acre Vadata Inc campus at 5109-5129 Hayden Run Rd, Hilliard. Broke ground 2015; first building completed ~2018; a multi-building campus that has continued expanding. Franklin County Auditor land-use class 'data center' with 768,498 sq ft of assessed building area (= built/operational); owner Vadata Inc (Amazon's data-center subsidiary). Data-center directories (DC Byte / baxtel) list several numbered Hayden Run buildings (5109/5113/5117/5121/5125) that correspond to buildings within this single county parcel, not separate sites. No site-specific IT-load MW is disclosed. Coordinates are the Franklin County Auditor parcel centroid. Distinct from the tracked AWS Cosgray Road and AWS Scioto Darby campuses (also Hilliard, Franklin County).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2018 · reported operational
First building completed ~2018 (AWS's first Ohio region facility, ground broken 2015) per data-center directories; Franklin County Auditor records the parcel with land-use class 'data center' and 768,498 sq ft of assessed building area (built).
Sources and attribution
- Franklin County Auditor parcel/GIS record (parcel 050-011444, 5109-5129 Hayden Run Rd — VADATA INC, land-use class 'data center', assessed building area 768,498 sq ft = built, 55.2 ac) · Franklin County Auditor GIS / Assessor
- Amazon Hilliard 5109 Hayden Run — AWS's first US East (Ohio) region data center; broke ground 2015, built ~2018, fully operational, multi-building campus · Baxtel
- AWS plans third data center campus in Hilliard, Ohio (DCD)
- Fuel Cells — City of Hilliard
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aws-hayden-run-hilliard-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.