AWS Cosgray Road Campus

reported operational

Amazon Web Services

Hilliard · Franklin County · Ohio

Capacity not statedSource updated 9 September 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Amazon Web Services
Address and locality
Hilliard · Franklin County · Ohio
Lifecycle status
reported operational
Facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000133

What the source record says

Separate AWS Hilliard campus on Cosgray Road, in active litigation: the City of Hilliard appealed an Ohio EPA air permit for a 228-unit Bloom Energy fuel-cell array (73MW, the largest fuel-cell array in North America), and AWS is separately seeking a permit for 158 diesel backup generators. Approved by the Ohio Power Siting Board under Ohio's HB15 behind-the-meter law, overriding local zoning. Distinct from the Scioto Darby campus. Coordinates are now parcel-exact via the Franklin County Auditor (parcel 050-011455, 4580-4640 Cosgray Rd, Amazon Data Services Inc, data-center use class, ~95 ac).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · reported under construction

    In active litigation over a 228-unit Bloom Energy fuel-cell array (73MW, largest fuel-cell array in North America) plus backup generators; approved by the Ohio Power Siting Board under HB15.

    Open cited source →

  2. 2026-07-19 · reported operational

    Flipped under_construction -> operational. Franklin County Auditor assessed building area is populated (880,352 sq ft) on the campus parcel (050-011455, land-use class 'data center', Amazon Data Services Inc) = built, not a bare shell; data-center directories (DC Byte / datacenterHawk) list the Cosgray buildings as operational. The Bloom Energy fuel-cell / backup-generator permitting litigation noted in the record concerns on-site power and does not bear on the data buildings' operational status.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID aws-cosgray-hilliard-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →