This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- QTS Data Centers
- Address and locality
- Blakely · Early County · Georgia
- Lifecycle status
- reported permitted
- Facility type
- data center
- Reported capacity
- Planned: 1,000 MW (source-reported; boundary not independently verified)
- Source freshness
- 26 July 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001196
What the source record says
Project Blue Hole in Blakely, Early County; DRI filed 2026, ~12M sq ft at full buildout by ~2035. ~1 GW+ is an estimate of ultimate scale (in notes). Coordinates are the Blakely area centroid. QTS Data Centers is owned by Blackstone (2021 take-private).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported permitted
QTS filed a DRI for a data center campus in Blakely, Early County; construction start targeted July 2026, first delivery Sept 2027, ~12M sq ft at 2035 buildout
Sources and attribution
- QTS targets two data center campuses in Georgia · Data Center Dynamics
- Riverdale Standard — Early County Georgia Data Center Ordinance Vote
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID qts-blue-hole-blakely-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.