Facility snapshot
- Operator as published
- Prologis
- Address and locality
- 5977 Silver Creek Valley Road · San Jose · Santa Clara County · California
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Planned: 99 MW (source-reported; boundary not independently verified)
- Source freshness
- 14 September 2026
- Location precision
- exact
- Source confidence
- reported
- Stable directory ID
dcd-dir-001175
What the source record says
5977 Silver Creek Valley Road, South San Jose. Three-story facility, 516,000 sq ft. Permit filed July 2026; ~2-year buildout once approved. Prologis states it will self-fund substation/transmission costs. Distinct from Prologis's already-tracked Project Sail, Project Cardinal, and Project Mila entries. Coordinates are approximate.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Prologis files to build 99MW data center in San Jose, California · Data Center Dynamics
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · Oak Ridge National Laboratory (ORNL) / HIFLD
- Large data center proposed to fill vacant site at 5977 Silver Creek Valley Road in San Jose · San Francisco YIMBY
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID prologis-silver-creek-valley-san-jose-ca. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.