Goodman Innovation Centre San Jose (NorthTown Data Center)

reported proposed

Goodman Group

350 West Trimble Road · San Jose · Santa Clara County · California · 95134

Planned 97.3 MWSource updated 14 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Goodman Group
Address and locality
350 West Trimble Road · San Jose · Santa Clara County · California · 95134
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Planned: 97.3 MW (source-reported; boundary not independently verified)
Source freshness
14 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000703

What the source record says

Site is 350 & 370 West Trimble Road at Orchard Parkway. The CEC applicant of record for the backup generating facility is GIC San Jose, LLC; Goodman announced the acquisition and redevelopment and renamed the estate. The 45.8 acres is the whole estate; the CEC gives the data center project site as about 28.5 acres.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-10-30 · reported proposed

    Goodman announced acquisition of the 45.8-acre estate for redevelopment into a two-building, ~414,000 sq ft data center campus with up to 97.3 MW available by 2028.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID goodman-innovation-centre-san-jose-ca. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.