Facility snapshot
- Operator as published
- PowerHouse Data Centers
- Address and locality
- Grand Prairie · Ellis County · Texas
- Lifecycle status
- reported under construction
- Facility type
- data center
- Reported capacity
- Planned: 1,800 MW (source-reported; boundary not independently verified)
- Source freshness
- 8 July 2026
- Location precision
- exact
- Source confidence
- confirmed
- Stable directory ID
dcd-dir-001140
What the source record says
1.8 GW DFW-area campus (Grand Prairie): 24 buildings across three phases with an on-site 1.8 GW switchyard. Grand Prairie spans Dallas/Tarrant/Ellis counties; the campus is in the Ellis County (southern) portion. Coordinates reflect the southern Grand Prairie / Ellis County zone. Provident cited 'at least $5B in direct construction impact' over the multi-year build-out (Bisnow) and ~$300M for one 360,000-sq-ft building (Dallas Innovates) - neither a confirmed campus capex pledge -> investmentUsd omitted. Ellis County adopted Chapter 312 abatement guidelines (~Oct 2025, $50M threshold); no executed abatement agreement for this campus was found.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · reported under construction
PowerHouse and Provident developing a 1.8 GW campus in the DFW area (Grand Prairie): 24 buildings across three phases, 1.8 GW switchyard
Sources and attribution
- PowerHouse and Provident to develop 1.8GW campus in DFW, Texas · Data Center Dynamics
- Provident, PowerHouse partner on 768-acre Texas data center campus · Bisnow
- DOE-funded UTA project tackles cooling costs amid AI data center demand · Dallas Innovates
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID powerhouse-provident-grand-prairie-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.