Neural Nexus Innovation District

reported proposed

Legacy Power Capital

Memphis · Shelby County · Tennessee

Capacity not statedSource updated 13 September 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Legacy Power Capital
Address and locality
Memphis · Shelby County · Tennessee
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Not stated
Source freshness
13 September 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-001041

What the source record says

Announced 2025-12-10 (per the Chamber press release dateline: 'MEMPHIS, TN. Wednesday, December 10, 2025'). Located on 'two full city blocks' in downtown Memphis described both as 'adjacent to FedExForum and Beale Street' and 'across from AutoZone Park' (Downtown Memphis Commission) -- these are the same downtown block cluster, but no street address or parcel has been published, so this pin uses the AutoZone Park landmark centroid, disclosed as approximate. Total project investment reported as $9.4B mixed-use (housing, retail, hotel, innovation center) anchored by a cloud data center; a separate reported first-phase figure of ~$400M and ~70MW of power (seen in secondary aggregation, not independently fetched this run) is omitted pending verification against a fetched primary source. Site is the former location of The Walk development on Union Avenue.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID neural-nexus-memphis-tn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →