This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Facility snapshot
- Operator as published
- Legacy Power Capital
- Address and locality
- Memphis · Shelby County · Tennessee
- Lifecycle status
- reported proposed
- Facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 13 September 2026
- Location precision
- approximate
- Source confidence
- reported
- Stable directory ID
dcd-dir-001041
What the source record says
Announced 2025-12-10 (per the Chamber press release dateline: 'MEMPHIS, TN. Wednesday, December 10, 2025'). Located on 'two full city blocks' in downtown Memphis described both as 'adjacent to FedExForum and Beale Street' and 'across from AutoZone Park' (Downtown Memphis Commission) -- these are the same downtown block cluster, but no street address or parcel has been published, so this pin uses the AutoZone Park landmark centroid, disclosed as approximate. Total project investment reported as $9.4B mixed-use (housing, retail, hotel, innovation center) anchored by a cloud data center; a separate reported first-phase figure of ~$400M and ~70MW of power (seen in secondary aggregation, not independently fetched this run) is omitted pending verification against a fetched primary source. Site is the former location of The Walk development on Union Avenue.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
- Legacy Power Capital Announces "Neural Nexus" Innovation District in Downtown Memphis - Greater Memphis Chamber · Greater Memphis Chamber
- Downtown Memphis to Get $9.4 Billion "Neural Nexus" Mixed-Use Development · Downtown Memphis Commission
Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID neural-nexus-memphis-tn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.
This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.