Licensed lead · not independently verified · dcd-dir-000969

Microsoft Douglasville Data Center Campus

reported under construction

Microsoft

Douglasville · Douglas County · Georgia

Capacity not statedSource updated 6 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Microsoft
Address and locality
Douglasville · Douglas County · Georgia
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Not stated
Source freshness
6 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000969

What the source record says

Four 245,000 sq ft technology facilities totaling ~980,000 sq ft on 160-acre parcel at 1601 North River Road, Douglasville. Part of Azure East US 3 region alongside facilities in East Point and Palmetto. Coordinates are Douglasville city centroid; actual site is northern Douglasville.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024-01 · reported proposed

    Plans filed for four 245,000 sq ft technology facilities on 160-acre parcel at 1601 North River Road as part of Azure East US 3 region

  2. 2024-06 · reported under construction

    Phase I construction commenced; full Azure East US 3 cloud region launch targeted 2027

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID microsoft-douglasville-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →