Microsoft Becker Data Center

reported proposed

Microsoft

Becker · Sherburne County · Minnesota

Capacity not statedSource updated 24 August 2026approximate location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Microsoft
Address and locality
Becker · Sherburne County · Minnesota
Lifecycle status
reported proposed
Facility type
data center
Reported capacity
Not stated
Source freshness
24 August 2026
Location precision
approximate
Source confidence
reported
Stable directory ID
dcd-dir-000962

What the source record says

Microsoft bought ~295 acres from Xcel Energy near the Sherco coal plant in Becker for ~$17.7M (closed 2024-02-12) 'with the intent' to build a data center. As of Oct 2025 no formal plans had been submitted to the city. Distinct site/operator from the already-tracked, suspended Amazon Becker project (~348 acres, same area; locally nicknamed 'Core Ridge') — not a duplicate.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID microsoft-becker-mn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →