Meta Prometheus

reported under construction

Meta

New Albany · Licking County · Ohio

Planned 1,000 MWSource updated 8 August 2026exact location · reported source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Meta
Address and locality
New Albany · Licking County · Ohio
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified)
Source freshness
8 August 2026
Location precision
exact
Source confidence
reported
Stable directory ID
dcd-dir-000948

What the source record says

Baxtel reports campus as partially operational in 2026 with future phases planned; overall 1 GW build-out still in progress. Site address 1500 Beech Rd NW cited in permit filings but not confirmed from independently accessible sources this session. Nuclear PPA claims partially corroborated (Vistra/Oklo via SEC filings and news; TerraPower unconfirmed). On-site gas generation capacity removed pending accessible source confirmation. County listed as Licking — consistent with Beech Road corridor at Licking/Franklin county boundary per stopohiodatacenters.org. OPSB approved a 250 MW behind-the-meter gas plant ("Socrates the Younger," Will-Power OH, LLC) on 109 acres at Clover Valley Rd & Harrison Rd NW, New Albany, with the primary consumer named as Sidecat LLC, a Meta affiliate — corroborating the on-site generation previously removed pending an accessible source, and revising the figure from an unconfirmed 200 MW to 250 MW. This is the plant's nameplate generation, not IT load; the record's capacityMw (1,000 MW planned) is unchanged.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11 · reported under construction

    Meta publicly confirms Prometheus at New Albany; described as world's first planned 1 GW data center; expected operational 2026. Baxtel (July 2026) reports some phases already operational with future phases planned — overall 1 GW build-out still under construction.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID meta-prometheus-new-albany-oh. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.