Licensed lead · not independently verified · dcd-dir-000745

Google Project Spade Campus

reported under construction

Google

New Florence · Montgomery County · Missouri

Planned 1,200 MWSource updated 25 July 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Facility snapshot

Operator as published
Google
Address and locality
New Florence · Montgomery County · Missouri
Lifecycle status
reported under construction
Facility type
data center
Reported capacity
Planned: 1,200 MW (source-reported; boundary not independently verified)
Source freshness
25 July 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000745

What the source record says

DISTINCT from aws-green-new-florence-mo (AWS Project Green): the two are on opposite sides of I-70 (Project Green north; Project Spade south, SE quadrant of the I-70/Hwy 19 interchange) - independently verified via DCD and Columbia Missourian. Site ~934 acres (~780 unincorporated + ~130 in New Florence). Developer: Related Digital. Campus targets 1.2 GW. INVESTMENT OMITTED: the $15B is Google's Missouri-STATEWIDE infrastructure pledge ('Google will invest $15 billion in building infrastructure in Missouri, including a data center in New Florence'); the campus itself is described only as 'multi-billion-dollar', so no firm campus investmentUsd is recorded. Amended from three buildings to two ~800,000 sq ft buildings; first operations targeted 2028. ~2,000 construction jobs and 'hundreds' of permanent jobs are projections (in notes, not jobs). Coordinates are an approximate site centroid (no verified parcel record).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-01 · reported proposed

    Google confirmed as Project Spade end user; administrative review completed

  2. 2026-03 · reported permitted

    Construction permits delivered

  3. 2026-04-01 · reported under construction

    Ground broken

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID google-spade-new-florence-mo. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections